Uniper has decided to recommission a 160MW pumped storage plant in Happurg, Germany, that was shut down in 2011.| Power Engineering International
Paris 2024 set a goal of halving the carbon footprint of the Games compared with the average of London 2012 and Rio 2016 and to this end implemented a pre-Games carbon reduction strategy.| Power Engineering International
Enapter has signed a deal to supply a 1MW electrolyser to Italy's Cogne Acciai Speciali SpA and is now making gains in the hydrogen market.| Power Engineering International
Fraunhofer Institute researchers have developed a module that is self-sufficient and reliable at producing solar-generated green hydrogen.| Power Engineering International