Enel Green Power North America has signed a swap agreement with Gulf Pacific Power to increase the Group’s US renewable capacity by 285MW.| Power Engineering International
Ørsted has released a statement confirming the decision to discontinue the Hornsea 4 project in the UK in its current form.| Power Engineering International
Elia Group announced that construction started on the Princess Elisabeth energy Island, located 45km off the coast in the North Sea.| Power Engineering International
Construction begins on NeuConnect’s German connection| Power Engineering International
Port of Setúbal works with RWE to become floating wind logistics hub| Power Engineering International