Proposals for Vehicular Tunnel / Grade Separator / Road Widening In Selected Corridors. Feasibility report and DPR for the tunnel roads project in Bengaluru.| data.opencity.in
The primary reason for citizens objecting to the CMP appears to be the proposed elevated corridors. The draft CMP has proposed around 90-km of elevated corridor, costing a total of about Rs 18,000 crore, in the next 10 years. | Bangalore Mirror