Scope management, or rather the lack of it, is one of the biggest reasons for project failure. Correctly defining what is and is not included in the project is absolutely foundational to good project management. I've seen many projects go south even though they had the right expertise, schedule, high quality deliverables, and even satisfied... [Read More]| ProjectEngineer
Hopefully your projects never have this type of variance! A variance is defined as a schedule, technical, or cost deviation from the project plan. Variances should be tracked and reported, as well as mitigated through corrective actions. There are two types of variance which normally receive most of the attention: Cost Variance Schedule Variance Calculating... [Read More]| ProjectEngineer
The project charter and scope statement can seem like one and the same sometimes. They are both usually contained early in the project management plan, and they both itemize the scope of the project to some extent. So what's the difference? Well, they have a slight difference in purpose. The project charter should contain the rationale... [Read More]| ProjectEngineer
Like termites that build their invisible kingdoms secretly and slowly, projects have a similar parasite that grows under the surface until it suddenly exposes itself with disastrous consequences. It's called scope creep, and it has eaten many projects alive. Scope creep is the unauthorized addition of tasks into a project. If the project manager is... [Read More]| ProjectEngineer
Knowledge Areas Project Scope Management Plan Scope Management Collect Requirements Define Scope Create WBS Validate Scope Control Scope Scope is one of the major components of project management planning. The project scope defines the boundaries of the project, that is, what is included and what is not. Scope is also one of the primary areas... [Read More]| ProjectEngineer
I was once part of a project which went behind schedule and over budget. The project manager asked the project team, which included me, to come up with reasons why the project was late. Naturally the team produced several reasons, and a scope change request along with a new budget was sent to the client. ... [Read More]| ProjectEngineer
Project controls are where the project manager makes their money. It is relatively easy to assign someone work. But how do you ensure the quality of that work? That the deadlines are met? Or that the cost is reasonable? A project manager that can control these things is worth their wage in gold. The triple constraints... [Read More]| ProjectEngineer
Earned value analysis is used to calculate the project status on two fronts: Schedule. Is the project ahead of or behind schedule? Cost. Is the project over or under budget? Let's say you are the project manager for the renovation of 3 hotel rooms. The tasks are as follows: Preparation. Jan. 1 - Jan. 10,... [Read More]| ProjectEngineer
Scope management, or rather the lack of it, is one of the biggest reasons for project failure. Correctly defining what is and is not included in the project is absolutely foundational to good project management. I've seen many projects go south even though they had the right expertise, schedule, high quality deliverables, and even satisfied... [Read More]| ProjectEngineer
Scope issues are the #1 reason for project failure. Today more than ever, it's imperative that all projects need a scope management plan. In its absence, project stakeholders tend to assume the project boundaries in their favor, and the result is generally not good. If there's one thing a project manager can do to make... [Read More]| ProjectEngineer
It's amazing how many projects do not know their true status until near the end, when there is little that can be done to ensure they finish on time or budget. The proper time to rigorously track project status is at the beginning, not at the end. This is when project risk can be managed... [Read More]| ProjectEngineer
The difference between a successful project and an unsuccessful one can usually be narrowed down to one word: Planning. The Project Management Institute (PMI) reports that only 64% of projects meet their intended goals, and from my experience working for a large engineering company, this is probably not too far out. But there is a... [Read More]| ProjectEngineer
Project planning is immensely underrated. Everyone has a story of how they could have planned better to avoid a disaster, even if they didn't look back and realise it. The Project Management Institute suggests that planning should ideally consist of about 20 - 30% of the time required to perform the project work. This is... [Read More]| ProjectEngineer