Navigating the Party Wall Act 3-metre rule? This surveyor's guide explains the Party Wall Act 1996 for building owners and adjoining neighbours.| https://acdesignsolution.com
Get building regulation drawings approved first time. Clear pricing, fast turnaround for extensions, lofts & conversions. London MCIAT team.| https://acdesignsolution.com
Planning permission in London lasts 3 years from approval to start work. Must be material operations (foundation trenches, concrete). Can extend via Section 73 (£86). If expired, reapply (8-13 weeks, £528 for householder). Take photos, notify Building Control.| AC Design Solution
Summary not available. Please add an excerpt manually.| AC Design Solution
The Party Wall Act 1996 creates confusion for property owners. Learn the 7 most common misconceptions about party wall procedures, from excavation distance rules to notice requirements. Expert guidance on compliance and avoiding delays| AC Design Solution