A short article to look at the first instance of the new ‘V_NWVIC_GFT1_750’ constraint equation binding - on Wednesday evening 10th September 2025 (not 36 hours after it had first been introduced). The post The new ‘V_NWVIC_GFT1_750’ constraint equation binds, on Wednesday evening 10th September 2025 appeared first on WattClarity.| WattClarity
We noticed Bruce Mountain’s comments on LinkedIn about Newport power station running overnight, so had a look in ez2view. The post Newport Power Station running, with Yallourn’s yips yielding 1 unit operations appeared first on WattClarity.| WattClarity
A brief look at recent operational challenges at Yallourn unit 4. The post Wobbles at Yallourn unit 4 appeared first on WattClarity.| WattClarity
The AEMO notifies that the new 'V_NWVIC_GFT1_750' constraint equation will first be invoked from 10L00 on Tuesday 9th September 2025. The post AEMO notes ‘New Victorian system normal constraint to manage contingency size on north-west Victoria’ appeared first on WattClarity.| WattClarity