The RN is now in a position where ageing frigates are being decommissioned well before the replacements are available. There is little that can be done in the short term, but here we attempt to analyse if and when the situation might be recovered. Type 23s holding on Following our analysis of this issue last […] The post The Royal Navy’s frigate gap – how deep and how long will it last? first appeared on Navy Lookout.| Navy Lookout
Another small milestone was reached in the Type 31 frigate programme with the addition of the ship's foremast on the 31st July. The mast, weighing 24 tonnes, was fabricated in the Venturer Building and then carried to the dockside before being craned onto the ship. HMS Venturer was rolled out of the construction hall on| Navy Lookout - Independent Royal Navy news and analysis