Given that we’ve written about that outage several times before, worth noting that Eraring Unit 3 came back online Sunday evening 12th October 2025. The post ER03 makes its way back online, Sunday evening 12th October 2025 appeared first on WattClarity.| WattClarity
A quick initial look at two lengthy periods of Non-Conformance at Aldoga Solar Farm on Sunday 12th October, with the first period seeing large negative Dispatch Error, and a blip in system frequency. The post Two bouts of >2 hours of Non-Conformance at Aldoga Solar Farm on Sunday 12th October 2025 appeared first on WattClarity.| WattClarity