Metro needs over $17B in the next ten years to reach and maintain the State of Good Repair (SGR), which accounts for approximately 70% of its total needs over the same period. As noted in our our previous post, Metro’s SGR needs are built off of a comprehensive inventory of existing assets as a part […]