Login
From:
Power Engineering International
(Uncensored)
subscribe
Turbine installation complete at Baltic Eagle offshore wind farm - Power Engineering International
https://www.powerengineeringint.com/renewables/wind/turbine-installation-complete-at-baltic-eagle-offshore-wind-farm/
links
backlinks
Roast topics
Find topics
Find it!
Turbine installation has been completed at the 476MW Baltic Eagle offshore wind farm, a joint venture between Iberdrola and Masdar.