Login
From:
Power Engineering
(Uncensored)
subscribe
Holtec to build its first two SMR-300 units at at Palisades nuclear site
https://www.power-eng.com/nuclear/smrs/holtec-to-build-its-first-two-smr-300-units-at-at-palisades-nuclear-site/
links
backlinks
The existing Palisades plant, which Holtec says is refurbished with an array of enhancements, is on track to be restarted by the end of 2025.Holtec wants to restart the shuttered large-reactor plant by the end of 2025.
Roast topics
Find topics
Find it!