Login
From:
SANDRP
(Uncensored)
subscribe
Subansiri Lower HEP faces damages in 2025 like in every year since 2019 – SANDRP
https://sandrp.in/2025/06/17/subansiri-lower-hep-faces-damages-in-2025-like-in-every-year-since-2019/
links
backlinks
Tagged with:
2020
2022
2024
2021
2023
2025
arunachal pradesh
hydro power projects
“The commissioning of the Subansiri Lower Hydro Electric Project (SLHEP) has been further delayed till May 2026” NHPC has now acknowledged. In a report filed by PTI, the project developer has ackno…
Roast topics
Find topics
Find it!