I spoke with a company recently that discovered that 20 teams had built business cases around moving the same metric. If ALL of those teams realized their "case," the metric would have increased by 500% (which was impossible, governed by physics). This was a failure in context, capturing Intent, a theory around investment, and likely a mismatch between reality and how the company perceived collaboration.