The first of three blocks, powered by GE Vernova’s 7HA.03 combined cycle equipment, is gradually replacing the existing coal-fired units at the site. The post Taiwan’s coal-to-gas transition advances as Hsinta power plant starts operating appeared first on Power Engineering International.