Case Study - Optimizing Transformer Load and Lifetime with On-Premises Analytics Customer Overview A leading European Electrical Utility managing high-voltage substations that support critical industrial and residential demand. Facing growing electrification pressures and long equipment procurement cycles, the operator sought to improve how existing transformer capacity was utilized. The Challenge At one of their key substations, the utility