Generac Power Systems held a ribbon cutting for its new manufacturing and assembly facility in Beaver Dam, Wisconsin, as the company aims to strengthen its North American production capabilities. The post Generac opens 345,000-square-foot manufacturing facility in Wisconsin appeared first on Power Engineering.