Doosan Škoda Power has announced the installation of two turbine sets as part of a modernisation effort at a heat and power plant in Plock, Poland. The plant, owned and operated by Polish energy company ORLEN, is being modernised in several phases, with the current phase requiring an investment of €125 million ($146 million). Doosan The post Doosan Škoda Power instals turbine sets at Polish heat and power plant appeared first on Power Engineering International.