Roast topics
Find topics
Roast it!
Roast topics
Find topics
Find it!
Login
From:
Hydropower: Dams, Turbines & Environmental Impact
(Uncensored)
subscribe
Statkraft aims to increase production at Alta hydro plant by as much as 20 percent
https://www.renewableenergyworld.com/hydro-power/statkraft-aims-to-increase-production-at-alta-hydro-plant-by-as-much-as-20-percent/
links
backlinks
Tagged with:
news
renewables
hydropower
Statkraft has submitted a license application for an upgrade of the Alta hydroelectric power plant in Norway, arguing that by utilizing water currently bypassing the plant during floods, production could increase by up to 20%.