Ignis, Metka, and Iberdrola accounted for more than 500 MW, almost half of the new capacity authorized by the Ministry for Ecological Transition and the Demographic Challenge (MITECO) in October. The analysis shows that the regulatory push is geared towards hybrid projects with storage and greater grid flexibility, while other developers opted for voluntary withdrawal.