Green hydrogen developer Protium has broken ground at its 2.5MWe electrolyser in South Wales called Pioneer 2, which is expected to be the UK’s largest installed PEM (proton exchange membrane) system. The post Ground broken at 2.5MWe green hydrogen electrolyser in South Wales appeared first on New Civil Engineer.