The 24-Month Study projects future Colorado River system conditions using single-trace hydrologic scenarios simulated with the Colorado River Mid-term Modeling System (CRMMS) in 24-Month Study Mode. The Most Probable and Probable Minimum 24-Month Studies are released monthly, typically by the 15th day of the month. The Probable Maximum 24-Month Study is released alongside other 24-Month Studies in January, April, August, and October. | www.usbr.gov
Bureau of Reclamation - Managing water and power in the West| www.usbr.gov
Columbia Cascades Area Office, CCAO, About Us, Bureau of Reclamation - Managing water and power in the West| www.usbr.gov
Bureau of Reclamation - Managing water and power in the West| www.usbr.gov
Bureau of Reclamation, Lower Colorado Region. Official Bureau of Reclamation Web Site for Hoover Dam. Information provided about the construction of the dam, how it works, and how to take a tour of the dam.| www.usbr.gov